MANSFIELD — The City of Mansfield has announced street resurfacing work is planned next week, weather permitting, including milling and/or paving, in the following areas:
— Andover Street from Woodland Road to Overlook Road
— Brookpark Drive from the south end to the north end
— Clifton Avenue from Main Street to the east end
— Cook Road from Lexington Avenue to Rachel Road
— Dunbuilt Court from Lexington Avenue to the east end
— Forest Hill Road from Woodhill Road to Andover Road
— Gilbert Avenue from Winwood Drive to Prospect Street
— Lawn Avenue from Lexington Avenue to Briarwood Road
— Lexdale Lane from Lexbrook Trail to Lexdale Trail
— Lexdale Trail from Trimble Road to Lexdale Lane
— South Main Street from Cook Road to the ramp on Ohio 13
— Marion Avenue from the corporation line to 400 feet west of Trimble Road
— Mulberry Street from Mendota Street to Glessner Avenue
— Overlook Road from Woodland Road to Davis Road
— Rosedale Drive from Springbook Drive
— Ruth Avenue from West Townview Circle to Wood Street
— Springbook Drive from Donal Drive to Rosedale Drive
Motorists are urged to use caution when driving in these construction areas.
