MANSFIELD — Main Street traffic in downtown Mansfield is again open to two-way traffic.

But if you are just passing through the city, there are better routes to take now that the $21 million corridor improvement project is largely complete.

“Our intent of this entire project was to improve the ‘to’ traffic — the destination traffic to downtown — without impacting the ‘through’ traffic,” city engineer Bob Bianchi said Tuesday.

The newly reconstructed corridor between First and Sixth streets was intentionally designed to slow vehicles down, Bianchi said, and prioritize pedestrians, diners and shoppers — rather than commuters passing from one end of town to the other.

In other words, if you are headed south through the city, use Mulberry Street. If headed north, use Diamond Street.

(The video below was produced as the Main Street Improvement Project was preparing to begin.)

Main Street’s signalized intersections in the corridor are not synchronized for continuous green lights.

Because frequent pedestrian crosswalk activations pause vehicle flow, taking Main Street straight through the central business district adds roughly three minutes to a commute compared to parallel routes.

To keep traffic moving quicker, the city previously converted both Mulberry and Diamond streets to two-way traffic in 2019 and 2021, respectively, timing their traffic signals to create north-south bypasses around the square:

  • Heading south through town: Turn right off Main Street onto West Fifth Street, turn left onto South Mulberry Street, turn left onto West Second Street and turn right back onto South Main Street. Signals along Mulberry Street are timed so drivers traveling at the posted speed limit can clear the corridor without stopping, Bianchi said.
  • Heading north through town: Use Second Street to access North Diamond Street, taking it north to Fifth Street before rejoining North Main Street. Diamond Street’s signals are synchronized for steady northbound progression, the engineer said.

“There’s a couple more turns, but it’s actually more efficient based off how the signals operate,” Bianchi said of the Mulberry and Diamond routes.

Don’t block the box

City officials also urge drivers to pay closer attention to lane markings and traffic space at downtown intersections to prevent unnecessary backups.

Since the Nov. 6 ribbon-cutting and reopening, downtown traffic has occasionally bottlenecked when north-south motorists pull forward into intersections before traffic ahead of them has cleared.

When the signal changes, those stranded vehicles block east-west cross traffic, sparking frustration and prolonged horn-honking along the corridor.

Drivers are reminded not to enter an intersection unless there is enough open space on the far side to clear it completely before the light turns red.

The $21 million Main Street Corridor Improvement Project — a centerpiece of the 2019 Mansfield Rising reinvestment plan — replaced century-old underground water and sewer lines while adding wider sidewalks, decorative arches, new lighting and two plazas along 1.11 miles of newly striped two-way roadway.

City editor. 30-year plus journalist. Husband. Father of 3 grown sons and also a proud grandpa. Prior military journalist in U.S. Navy, Ohio Air National Guard. -- Favorite quote: "Where were you when...